Logo

Circuit trip switch installation or repair

1 Hours
Hygienic & Safe
Verified Experts

We install or repair circuit trip switches such as MCB, RCCB, or RCBO with proper isolation, secure terminations, and functional testing. Trip response and load handling are verified before handover for safe and reliable operation.

₹380

₹4005% OFF
100% Satisfaction
Easy Cancellation
Trusted Professionals
Circuit trip switch installation or repair
4.89

Important Notes

Please read before proceeding

Switch off the main power supply before service
Keep the MCB or fuse area accessible
Inform the technician about the issue or faulty unit
Allow the technician to test and repair safely

Included:

  • Installation or replacement of faulty circuit trip switch (MCB/RCCB/RCBO) at existing DB location.
  • Proper wiring connection and secure termination to ensure safe current flow.
  • Testing the trip mechanism to ensure correct overload/short-circuit protection.
  • Basic safety checks and load verification after installation or repair.

Excluded:

Circuit trip switch (MCB/RCCB/RCBO) cost is not included unless selected additionally.

Major rewiring or load redistribution is excluded.

Replacement of complete distribution board (DB) is not covered.

Wall cutting, civil work, or panel relocation is not included.

Customer Precautions

Warranty Condition
Included/Excluded
30-day service warranty.
Valid only for HomeNeedsPro electrician services.
Does not cover customer-supplied materials.
Does not cover damage due to misuse, overload, or external faults.

HomeNeedsPro Assurance

🛡️ Certified and verified electricians

⭐ Trusted and experienced professionals

📈 20k+ orders completed

🎓 Fully trained professionals

Our Kit

What We Bring

What We Bring

MCB/RCCB/RCBO testing tools, insulated electrician kit, connectors, busbar accessories, and mounting hardware. We bring safety gear and wiring essentials for secure installation or repair.

What We Might Need From You

What We Might Need From You

Clear access to the distribution board (DB) and permission to shut down power during work. Ensure safe working space near the panel.